Rapid Rail

Rapid Rail Sdn Bhd
Company typePrivate Limited
IndustryPublic Transport Operator
FoundedMalaysia (2002 (2002)) (as Rangkaian Pengangkutan Integrasi Deras Sdn Bhd)
Headquarters
No. 1, Jalan PJU 1A/46, Off Jalan Lapangan Terbang Subang, 47301 Petaling Jaya, Selangor.
Area served
Klang Valley
Key people
Amir Hamdan (Chief Executive Officer)
Vacant (Chief Operating Officer, LRT & Monorail
Ramli Shafie (Chief Operating Officer, MRT
ServicesRailways
ParentPrasarana Malaysia
Websitewww.myrapid.com.my

Rapid Rail Sdn Bhd is the operator of the rapid transit (metro) system serving Kuala Lumpur and the Klang Valley area in Malaysia.[1] A subsidiary of Prasarana Malaysia, it is the sole operator of five rapid transit lines which collectively form the Rapid KL rapid transit system. The system currently consists of three light rapid transit (LRT) lines, two mass rapid transit (MRT) lines and a monorail line, with another MRT and LRT line currently under construction.[2]

The LRT (narrow profile) and MRT (wide profile) lines operate on standard gauge (1,435 mm (4 ft 8+12 in)) rail, while the KL Monorail operates on an ALWEG straddle beam. Train services operate from 6:00 a.m. and typically end before midnight daily,[3] with frequencies varying from approximately three minutes during peak hours to fourteen minutes during non-peak hours.[4]

  1. ^ "Profile - SYARIKAT PRASARANA NEGARA BERHAD". Syarikat Prasarana Negara. Archived from the original on 2 February 2014. Retrieved 12 June 2014.
  2. ^ "LRT". MyRapid (Syarikat Prasarana Negara Berhad). Archived from the original on 2 February 2014. Retrieved 28 April 2014.
  3. ^ "Operating Hours". MyRapid (Syarikat Prasarana Negara Berhad). Archived from the original on 1 July 2014. Retrieved 12 June 2014.
  4. ^ "Train Frequency". MyRapid (Syarikat Prasarana Negara Berhad). Archived from the original on 20 December 2010. Retrieved 12 June 2014.

From Wikipedia, the free encyclopedia · View on Wikipedia

Developed by Tubidy